​​​​​​​​​​​​​​​​​​

Document Search

Use this tool to sort or search for a wide variety of Capital Planning, Design and Construction documents, forms, templates and other resources. 

Phase

 

Delivery Methods

 

Campus

 

Form Type

 

Year

 

Keyword (Title)


Search ​​Reset Filters

Can't find the form you're looking for? Try searching SUAM (State University Administrative Manual) and Sample Forms (Construction Management).​

  
  
Phase
  
  
  
Delivery Methods
  
  
Form Type
  
  
Chapter II - Article A1 - Request for QualificationsChII-Art_A1b-RFQ.docxPrequalification1/9/2020Design-BuildForm2020
CMAR-Overview-RFP Process Checklistcmr_model_ch_i_overview_checklist_rfp_process.xlsx1/3/2020Construction Manager at RiskReference2020
CMAR-Overview-RFQ Process Checklistcmr_model_ch_i_overview_checklist_rfq_process.xlsx1/3/2020Construction Manager at RiskReference2020
2020-21 Prequal Application2020-2021-prequal-application.docx1/1/20202020/21
CMAR-Request for Qualificationscmr_model_ch_ii_rfq_for_cmr.docxBid, Prebid1/1/2020Construction Manager at RiskReference2020
Agreement Bonds Certification Formsaw_agreement_bonds_certification_forms.docxAward702.0112/4/2019Design-Bid-Build-MajorForm2019
Agreement Bonds Certification Forms CMRaw_agreement_bonds_certification_forms_cmr.docxAward, Agreements702.01CMR12/4/2019Construction Manager at RiskForm2019
Agreement Bonds Certification Forms CMR TOCAaw_agreement_bonds_certification_forms_cmr_toca.docxAward, Agreements702.01CMR.TO-CA12/4/2019TOCA-CMR, TOCAForm2019
Agreement Bonds Certification Forms CDB TOCAaw_agreement_bonds_certification_forms_cdb_toca.docxAgreements, Prebid, Award702.01CDB.TOCA12/4/2019TOCA, TOCA-CDBForm2019
Agreement Bonds Certification Forms DBaw_agreement_bonds_certification_forms_db.docxAward702.01DB12/4/2019Design-BuildForm2019
Agreement Bonds Certification Forms for Collaborative Design Buildaw_agreement_bonds_certification_forms_cdb.docxAward702.01CDB12/1/2019Collaborative-Design-BuildForm2019
Checklist of Labor Law RequirementsLC-Checklist-of-Labor-Law-Requirements-Non-CSU-LCP.docxAwardCSU.LC.00A12/1/2019Form2019
2020/2021 through 2024/2025 Five-Year Plan2020-21-through-2024-25-five-year-plan.pdf11/13/2019Major Capital Outlay Program2020/21
TOCA MEA Abstract of Bids (Fee) Proposals HRbd_abstract_of_bids_to-ca_mea_hr.xlsxBid701.01.TOCA.MEA-HR11/5/2019TOCA, TOCA-CDB, TOCA-CMRForm2019
TOCA MEA Abstract of Bids (Fee) Proposal PCTbd_abstract_of_bids_to-ca_mea-pct.xlsxBid701.01.TOCA.MEA-PCT11/5/2019TOCA, TOCA-CDB, TOCA-CMRForm2019
Small Business Preferencebd_small_business_preference.docxBid701.0911/1/2019TOCA-CDB, Collaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-Build, Job Order Contracts, TOCA-CMRForm2019
Prime Contractor's DVBE Subcontracting ReportPrime-DVBE-Sub-Report.xlsxConstruction Phase, Bid810P10/7/2019TOCA, TOCA-CDB, Collaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build, Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-Build, Job Order ContractsForm2019
Department DVBE Subcontracting ReportDGS-Departments-DVBE-Subcontracting-Report-Form_810D.xlsxBid810D10/7/2019TOCA, TOCA-CDB, TOCA-CMR, Collaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-Build, Job Order Contracts, Design-Bid-BuildForm2017
Bid Proposal Form DB bd_bid_proposal_form_db.docxBid700.05DB9/26/2019Design-BuildForm2019
Bid Proposal Form CMARbd_bid_proposal_form_cmr.docxBid700.05CM9/26/2019Construction Manager at RiskForm2019
Bid Proposal Form DBBbd_bid_proposal_form_dbb.docxBid700.05DBB9/26/2019Design-Bid-Build-Minor, Design-Bid-Build-MajorForm2019
Task Order for Services HRto-ca_mea_task_order.hr.docxPrebid8/28/2019TOCA, TOCA-CDB, TOCA-CMRForm2019
Task Order for Services PCTto-ca_mea_task_order.pct.docxPrebid8/28/2019TOCA, TOCA-CDB, TOCA-CMRForm2019
01 33 00 - Submittal Procedures01_33_00_Submittal_Procedures.doc8/1/2019Division 01
TOCA MEA: Use of Percentage Fee vs. Hourly Rate Feesto-ca_mea_use_of_prcnt_fee_v_hrlyrates.docxAgreements, Prebid7/26/2019TOCA, TOCA-CDB, TOCA-CMRForm2019
TOCA MEA Request for Qualifications HRto-ca_mea_rfq_hr.docxPrebid7/26/2019TOCA, TOCA-CDB, TOCA-CMRForm2019
TOCA MEA Request for Proposals HRto-ca_mea_rfp_hr.docxPrebid7/26/2019TOCA, TOCA-CDB, TOCA-CMRForm2019
TOCA MEA Request for Qualifications PCTto-ca_mea_rfq_pct.docxPrebid7/26/2019TOCA, TOCA-CDB, TOCA-CMRForm2019
CM 19-05cm_19-05.pdf7/16/2019CPDC Bulletins2019
CM 19-04cm_19-04.pdf7/15/2019CPDC Bulletins2019
Project Closeout Checklistcm_project_closeout_checklist.docxConstruction Phase702.02P7/1/2019Form2019
Agreement Certificationagreement-certification.docxAward7/1/2019Form2019
Supplementary General Conditions for Design-Build Projectssgcs_db_major.docxConstruction Phase7/1/2019Design-BuildGeneral Conditions2019
CDB - Exhibit B Fee Schedulecdb_svc_agmt_exh_b_fee_schedule.docxConstruction Phase, Bid, Prebid7/1/2019TOCA, TOCA-CDB, Collaborative-Design-BuildReference2019
Request for Proposals for Collaborative Design Buildcdb_rfp.docxBid, Prebid7/1/2019Collaborative-Design-BuildReference2019
CM 19-03cm_19-03.pdf7/1/2019CPDC Bulletins2019
CMAR-RFQ for CMAR with GMPcmr_model_ch_ii_rfq_for_cmr-wgmp.docxBid, Prebid6/6/2019Construction Manager at RiskReference2019
Supplementary Auxiliary Design Build Projectssgcs_auxiliary_db_major.docxConstruction Phase6/1/2019Design-BuildGeneral Conditions2019
Supplementary Auxiliary Construction Manager at Risk Projectssgcs_auxiliary_cmr_major.docxConstruction Phase6/1/2019Construction Manager at RiskGeneral Conditions2019
Supplementary Auxiliary Collaborative Design Build Projectssgcs_auxiliary_cdb_major.docxConstruction Phase6/1/2019Collaborative-Design-BuildGeneral Conditions2019
Notice of Completioncm_notice_of_completion.docxConstruction Phase702.025/30/2019TOCA, TOCA-CDB, Design-Bid-Build-Major, Design-Build, Design-Bid-Build-Minor, Collaborative-Design-Build, Construction Manager at Risk, Job Order Contracts, Design-Bid-Build, TOCA-CMRForm2019
CM 19-02cm_19-02.pdf5/10/2019CPDC Bulletins2019
Self-Performed Work - CPDC MemoSelf Performed Work Final.pdfAgreements5/9/2019Collaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build, Design-Bid-Build-Major, Design-Build, Job Order Contracts, TOCA, TOCA-CDB, TOCA-CMRReference
AE19-002AE-19-002-Limits-on-Contracts-per-GOV-Code-1090.pdf4/2/2019CPDC Bulletins
TOCA MEA Bid (Fee) Proposal Form PCTbd_bid_proposal_form_to-ca_mea-pct.docxBid700.05.TOCA-PCT4/1/2019TOCA, TOCA-CDB, TOCA-CMRForm2019
CMAR - RFP - Technical Proposal Evaluation Scoresheetcmr_model_app_4.2_tech_prop_eval_scoresheet.xlsxPrebid4/1/2019Construction Manager at RiskReference2019
Forefront Power, LLCbattery-mea-180567.pdfAgreements1805674/1/2019AllMaster Enabling Agreements2019
SunPower Corporation Systemsbattery-mea-180568.pdfAgreements1805684/1/2019AllMaster Enabling Agreements2019
ENGIE Services U.S. Inc.battery-mea-180598.pdfAgreements1805984/1/2019AllMaster Enabling Agreements2019
EDF Renewables Distributed Solutions, Inc. MEAbattery-mea-180565.pdfAgreements1805654/1/2019AllMaster Enabling Agreements2019
Task Order Request for Services HRtask_order_request-hr_only.docxPrebid4/1/2019TOCA, TOCA-CDB, TOCA-CMRForm2019
TOCA MEA Bid (Fee) Proposal Form HRbd_bid_proposal_form_to-ca_mea_hr.docxBid, Prebid700.05.TOCA-HR4/1/2019TOCA, TOCA-CDB, TOCA-CMRForm2019
CSU CEQA Training Webcast SlidesCSU_CEQA_Webcast_Training2019.pdf4/1/2019Reference2019
CSU CEQA HandbookCSU CEQA Handbook.pdf4/1/2019Reference
Preconstruction Meeting Letteraw_preconstruction_mtg_ltr.docxAward702.113/19/2019Form2019
AE19-001AE-19-001-2019-Code-Cycle-Adoption.pdf3/14/2019CPDC Bulletins
​Supplementary General Conditions for Design-Bid-Build Minor Projectssgcs_dbb_minor.docxConstruction Phase3/1/2019Design-Bid-Build-MinorGeneral Conditions2019
​Supplementary General Conditions for Design-Bid-Build Major Projectssgcs_dbb_major.docxConstruction Phase3/1/2019Design-Bid-Build-MajorGeneral Conditions2019
Supplementary General Conditions for Construction Manager at Risk (CMAR) Major Projectssgcs_cmr_major.docxPrebid, Construction Phase, Bid3/1/2019Construction Manager at RiskGeneral Conditions2019
​Supplementary General Conditions for Auxiliary Design-Bid-Build Major Projectssgcs_auxiliary_dbb_major.docxConstruction Phase3/1/2019Design-Bid-Build-MajorGeneral Conditions2019
Supplementary General Conditions for Collaborative Design-Buildsgcs_cdb_major.docxConstruction Phase, Bid, Prebid3/1/2019Collaborative-Design-BuildGeneral Conditions2019
LU 19-01LU19-01 CEQA SB 743 Guidance.pdf3/1/2019CPDC Bulletins2019
CSU Transportation Study Impact ManualCSU Transportation Study Impact Manual.pdf3/1/2019Reference2019
CM 19-01cm_19-01.pdf1/18/2019CPDC Bulletins2019
Capital Outlay Management Plan TemplateCapOutlayMgntPlanTemplate.docxCapital Outlay Management Plan1/2/2019
CMAR - Exhibit A Scope of Workcmr_model_precon_svc_agmt_exh_a_scope_of_work.docx11/9/2018Construction Manager at RiskReference2018
CMAR - Exhibit B Fee and Payment Schedulecmr_model_precon_svc_agmt_exh_b_fee_and_payment_schedule.docx11/9/2018Construction Manager at RiskReference2018
CMAR - Exhibit C Service Provider Hourly Rate Schedulecmr_model_precon_svc_agmt_exh_c_service_provider_hourly_rate_schedule.docxPrebid11/9/2018Construction Manager at RiskReference2018
01 32 10 - Collaborative Construction Planning Process01_32_10_Collaborative_Construction_Planning_Process.docx11/1/2018Division 01
2019/2020 through 2023/2024 Five-Year Planfive-year-plan-2019-20.pdf10/25/2018Major Capital Outlay Program2019/20
CM 18-05cm_18-05.pdf10/19/2018CPDC Bulletins2018
Appendix G CEQA ProceduresApp_G-CEQA_Procedures-4.02.doc10/15/20182018
Contract Payment Request DBcm_db_contract_payment_request.xlsxConstruction Phase702.12DB9/1/2018Design-BuildForm2018
Contract Payment Requestcm_contract_payment_request.xlsxConstruction Phase702.129/1/2018Design-Bid-Build, Design-Bid-Build-Minor, Job Order Contracts, TOCA, TOCA-CDB, Design-Bid-Build-MajorForm2018
Subcontractor Prequalification PT1pq_subcontractor_prequalification_pt1.pdfPrequalification703.11-Sub7/18/2018Reference2018
Rider B Scope of Work HRto-ca_mea_rider-b_scope_of_work_hr.docxAgreements, Prebid7/17/2018TOCA, TOCA-CDB, TOCA-CMRForm2018
Rider B Scope of Work PCTto-ca_mea_rider-b_scope_of_work_pct.docxAgreements, Prebid7/17/2018TOCA, TOCA-CDB, TOCA-CMRReference2018
TOCA Master Enabling Agreement HRto-ca_master_enabling_agreement_hr.docxAgreements, Prebid7/9/2018TOCA, TOCA-CDB, TOCA-CMRForm2018
TOCA Master Enabling Agreement PCTto-ca_master_enabling_agreement_prcnt.docxAgreements, Prebid7/9/2018TOCA, TOCA-CDB, TOCA-CMRForm2018
Digital Energy170050.pdf1700507/1/2018AllMaster Enabling Agreements2018
01 74 19 - Construction Waste Management01_74_19_Construction_Waste_Management.docx7/1/2018Division 01
Reconciliation of Project Costscm_reconciliation_of_project_costs.xlsxConstruction Phase702.02RPC6/4/2018Collaborative-Design-Build, TOCA-CDB, Construction Manager at Risk, TOCA-CMR, TOCAForm2018
CM 18-04cm_18-04.pdf5/17/2018CPDC Bulletins2018
TOCA Calculation of Fees and GMP Exemplar (for TOCA Collaborative Design Build Only)toca_cdb_calculation-of-fees-and-gmp-exemplar.xlsxConstruction Phase, Prebid, Bid5/17/2018TOCA, TOCA-CDBForm2018
CM 18-03cm_18-03.pdf5/4/2018CPDC Bulletins2018
Payee Data Recordsa_payee_data_record_std204.pdfAward, Service AgreementSTD 2045/1/2018Construction Manager at Risk, Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-Build, Job Order Contracts, Design-Bid-BuildForm2018
Fair Employment Practices Compliance Reportcm_fair_employment_practices_compliance_report.docxConstruction Phase702.184/30/2018TOCA, TOCA-CDB, Design-Bid-Build, Design-Bid-Build-Major, Design-Bid-Build-Minor, Collaborative-Design-Build, Construction Manager at Risk, Job Order Contracts, TOCA-CMRForm2018
Notice of Intent to Accept Bidaw_notice_of_intent_to_accept_bid.docxAward4/26/2018Form2018
01151A-Contractors Construction Waste and Recycling Plancm_contractors_construction_waste_and_recycling_plan_01_74_19A.xlsxConstruction Phase01 74 19A4/24/2018Collaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-Build, Job Order ContractsForm2018
01151B-Contractors Reuse Recycling and Disposal Reportcm_contractors_reuse_recycling_and_disposal_report_01_74_19B.xlsxConstruction Phase01 74 19B4/24/2018Collaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Bid-Build-Minor, Job Order Contracts, Design-BuildForm2018
02060B-Building Demolition, Contractors Reuse, Recycling, and Disposal Reportcm_building_demolition_contractors_reuse_recycling_and_disposal_report_02_41_00B.xlsxConstruction Phase02 41 00B4/23/2018Collaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-Build, Job Order ContractsForm2018
02060A-Building Demolition, Contractors Waste and Recycling Plancm_building_demolition_contractors_waste_and_recycling_plan_02_41_00A.xlsxConstruction Phase02 41 00A4/23/2018Collaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-Build, Job Order ContractsForm2018
AE18-002 R1PB-18-002-R1.pdf4/2/2018CPDC Bulletins
Preconstruction Meeting Package Contentsaw_preconstruction_mtg_package_contents.docxAward702.11C4/1/2018Form2018
AE18-001TB-18-001-Occupant-Load-Factor.pdf3/26/2018CPDC Bulletins
CM 18-02cm_18-02.pdf3/12/2018CPDC Bulletins2018
TOCA MEA Notice to Proceedaw_notice_to_proceed_to-ca_mea.docxAward702.16.MEA3/9/2018TOCA, TOCA-CDB, TOCA-CMRForm2018
Abstract of Bids DBBbd_abstract_of_bids_dbb.xlsxBid701.01DBB3/1/2018Design-Bid-Build, Design-Bid-Build-Major, Design-Bid-Build-MinorForm2018
2018/2019 through 2022/2023 Facilities Renewal and Capital Improvement Plan Book2018-2019-capital-outlay-program.pdf1/29/2018Major Capital Outlay Program2018/19
Agreement Bonds Certification Forms Minors DBBaw_agreement_bonds_certification_forms_minor.docxAward702.01M1/15/2018Design-Bid-Build-MinorForm2018
Previous201 - 300Next