CPDC Resource Library

Use this tool to sort or search for a wide variety of Capital Planning, Design and Construction documents, forms, templates and other resources. 

Phase

 

Delivery Methods

 

Campus

 

Form Type

 

Year

 

Keyword (Title)


Search ​​Reset Filters

Can't find the form you're looking for? Try searching SUAM (State University Administrative Manual) and Sample Forms (Construction Management).​

  
  
Phase
  
  
  
Delivery Methods
  
  
Form Type
  
  
CSU Permitting and Plan Review GuidelinesCSU_Permitting_Plan_Review_Guidelines.pdf4/1/2022Collaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build, Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-Build, Job Order Contracts, TOCA, TOCA-CDB, TOCA-CMRReference
Guidelines - CSU TIP Standards (Telecommunication Infrastructure Planning)TIP-Standards.pdf3/31/2022Reference
CSU Feasibility Study GuidelinesCSU Feasiblity Study Guidelines.pdfProgramming, Capital Outlay Budget Change Proposal9/20/2021Reference
CSU Owner's Project Requirements GuideOwners Project Requirements Guide.pdfProgramming, Capital Outlay Budget Change Proposal9/20/2021Reference
Service Agreement General Provisions Guide09-04-II_SP General Provisions Guide.docxAgreements09-04-II_SP5/25/2021Instructions, Reference
Service Agreement General Provisions Guide09-04-II_SP General Provisions Guide.pdfAgreements, Service Agreement09-04-II_SP5/25/2021Instructions, Reference
AB262 Step by Step GuideAB262-step-by-step-guide.pdf4/23/2020TOCA, Job Order Contracts, Design-Build, Design-Build-Build, Design-Bid-Build-Minor, Design-Bid-Build-Major, Construction Manager at Risk, Collaborative-Design-BuildReference2020
CMAR-Model and Guidelines Table of Contentscmr_model_toc.pdfPrebid1/13/2020Construction Manager at RiskReference2020
CSU Real Property Partnership Process Guidecsu-real-property-partnership-process-guide.pdf1/1/2017Reference2017
CMAR-RFP Model and Guidelines Covercmr_model_cover.pdf4/1/2013Construction Manager at RiskReference2013
Construction Filing GuidePB_Construction_Filing_Guide.doc
Checked Out To: Tsik, TheresaPB_Construction_Filing_Guide.doc
Checked Out To: Tsik, TheresaPrebid10/18/2006
Design Filing GuidePB_Design_Filing_Guide.docPrebid10/12/2006
Guidelines - CSU Access Compliance Design Guidelines2011-CSU-Access-Design-Guidelines.pdfReference
Guidelines - Commissioning Guideline For CSU Capital Projectscommissioning_guidelines.pdfReference
Guidelines - Control Systems Procurement Guidecontrols_procurement_guidelines.pdfReference
Guidelines - CSU Energy PolicyEO-987.pdfReference
Guidelines - CSU Energy Metering for Utilities ManagementCSU_Energy_Metering_Guide_Part_II.pdfReference
Guidelines - CSU Indoor Lighting GuideCSUIndoorLightingGuide.pdfReference
Guidelines - CSU Mechanical and Electrical Basis of Design GuidelinesBasisofDesignGuidance_Rev-11.24.15.pdfReference
Guidelines - CSU Metering GuideCSU_Metering_Guide.pdfReference
Guidelines - Outdoor Lighting Design GuideTB_08010_MRBOutdoor_Lighting_Design_Guide.pdfReference
Guidelines - Seismic Requirements - Post Tensioned Concrete StructuresCSU_SRB_Guidelines_18.pdfReference
Guidelines - Utilities Infrastructure Master Plan Guideline for CSU Campusesinfrastructure_guidelines.pdfReference
Custodial and Farm Space Policy and GuidelinesPolicy.pdfSpace ManagementReference
CSU Climate Resilient Infrastructure GuidelinesCSU Resilience Framework.pdf