​​​​​​​​​​​​​​​​

CPDC Resource Library

Use this tool to sort or search for a wide variety of Capital Planning, Design and Construction documents, forms, templates and other resources. 

Phase

 

Delivery Methods

 

Campus

 

Form Type

 

Year

 

Keyword (Title)


Search ​​Reset Filters

Can't find the form you're looking for? Try searching SUAM (State University Administrative Manual) and Sample Forms (Construction Management).​

  
  
Phase
  
  
  
Delivery Methods
  
  
Form Type
  
  
CPDC 2-7 Capital Outlay EstimateCPDC2-7-capital-outlay-estimate.xlsxProgramming, Bid, Construction PhaseCPDC 2-73/14/2024Collaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-Bid-Build, Design-BuildForm, SUAM2025/26
CSU JOC Regional Mechanical Pre-Bid Presentation 2024 - FinalJOC_RJOC-MechConst_PreBid_Presentation2024_Final.pdfBid1/16/2024Job Order ContractsReference2024
Contract General Conditions for Job Order Contractscgc_joc.pdfConstruction Phase, Bid, Prebid11/1/2023Job Order ContractsGeneral Conditions2023
Request for Qualifications for Collaborative Design Buildcdb_rfq.docxBid, Prebid9/1/2023Collaborative-Design-BuildReference2023
Contract General Conditions for Construction Manager at Risk Projectscgc_cmr.pdfConstruction Phase, Prebid, Bid8/31/2023TOCA, Construction Manager at Risk, TOCA-CMRGeneral Conditions2023
Contract General Conditions for Design-Build Projectscgc_db.pdfConstruction Phase, Bid, Prebid8/31/2023Design-BuildGeneral Conditions2023
Contract General Conditions for Collaborative Design-Build Major Projectscgc_cdb.pdfConstruction Phase, Prebid, Bid8/31/2023Collaborative-Design-Build, TOCA, TOCA-CDBGeneral Conditions2023
Bid Proposal Form CDBbd_bid_proposal_form_cdb.docxBid700.05CDB7/3/2023Collaborative-Design-BuildForm2023
Supplementary General Conditions to Contract General Conditions for Collaborative Design-Build Major Projects [for TOCA only]sgcs_cdb_major_to-ca.docxConstruction Phase, Prebid, Bid7/3/2023TOCA, TOCA-CDBGeneral Conditions2023
Contract General Conditions for Design-Bid-Build Minor Projectscgc_dbb_minor.pdfConstruction Phase, Bid, Prebid3/1/2023Design-Bid-Build-MinorGeneral Conditions2023
Contract General Conditions for Design-Bid-Build Major Projectscgc_dbb_major.pdfConstruction Phase, Bid, Prebid3/1/2023Design-Bid-Build-MajorGeneral Conditions2023
CSU JOC Regional Roofing Pre-Bid Presentation 2023 – Finalcsu-joc-regional-roofing-pre-bid-presentation-2023-final.pdfBid, Prebid2/27/2023Job Order Contracts2023
Notice To Contractors JOCbd_notice_to_contractors_joc-single.docxBid700.04J8/3/2022Job Order ContractsForm2022
Bid Proposal Form JOCbd_bid_proposal_form_joc.docxBid700.05J8/3/2022Job Order ContractsForm2022
Abstract of Bids JOC - 2022bd_abstract_of_bids_joc.xlsmBid701.01JOC3/17/2022Job Order ContractsForm2022
List of Subcontractors for DB and CDB Projectsbd_list_of_trade_contractors_db_cdb_projects.docxBid701.04-DB.CDB6/22/2021Collaborative-Design-Build, Design-BuildForm2021
Notice to Contractors CDB [Request for Qualifications (Advertisement)]bd_notice_to_contractors_cdb.docxBid700.04CDB5/13/2021Collaborative-Design-BuildForm2021
Notice to Contractors CMAR - RFQ [Advertisement]bd_notice_to_contractors_cmr.docxBid700.04CMR5/13/2021Construction Manager at RiskForm2021
Notice to Contractors DBBbd_notice_to_contractors_dbb.docxBid700.04DBB5/13/2021Design-Bid-Build-Major, Design-Bid-Build-MinorForm2021
Notice to Contractors DB (RFP)bd_notice_to_contractors_db-rfp.docxBid700.04DB5/13/2021Design-BuildForm2021
Notice to Contractors DB (RFQ)bd_notice_to_contractors_db-rfq.docxBid700.04DB5/13/2021Design-BuildForm2021
Notice to Contractors TOCA MEA - RFQ [Advertisement]bd_to-ca_master_enabling_agreement_rfq_advertisement.docxBid700.04TOCA5/13/2021TOCA, TOCA-CDB, TOCA-CMRForm2021
Supplementary General Conditions for Construction Manager at Risk (CMAR) Task Order Construction Agreement​ (TOCA)sgcs_cmr_major_to-ca.docxPrebid, Construction Phase, Bid4/8/2021Construction Manager at RiskGeneral Conditions2019
TOCA MEA Request for Proposals PCTto-ca_mea_rfp_pct.docxBid, Construction Phase2/26/2020TOCA, TOCA-CDB, TOCA-CMRForm2020
CMAR-Request for Qualificationscmr_model_ch_ii_rfq_for_cmr.docxBid, Prebid1/1/2020Construction Manager at RiskReference2020
TOCA MEA Abstract of Bids (Fee) Proposals HRbd_abstract_of_bids_to-ca_mea_hr.xlsxBid701.01.TOCA.MEA-HR11/5/2019TOCA, TOCA-CDB, TOCA-CMRForm2019
TOCA MEA Abstract of Bids (Fee) Proposal PCTbd_abstract_of_bids_to-ca_mea-pct.xlsxBid701.01.TOCA.MEA-PCT11/5/2019TOCA, TOCA-CDB, TOCA-CMRForm2019
Small Business Preferencebd_small_business_preference.docxBid701.0911/1/2019TOCA-CDB, Collaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-Build, Job Order Contracts, TOCA-CMRForm2019
Prime Contractor's DVBE Subcontracting ReportPrime-DVBE-Sub-Report.xlsxConstruction Phase, Bid810P10/7/2019TOCA, TOCA-CDB, Collaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build, Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-Build, Job Order ContractsForm2019
Department DVBE Subcontracting ReportDGS-Departments-DVBE-Subcontracting-Report-Form_810D.xlsxBid810D10/7/2019TOCA, TOCA-CDB, TOCA-CMR, Collaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-Build, Job Order Contracts, Design-Bid-BuildForm2017
Bid Proposal Form DB bd_bid_proposal_form_db.docxBid700.05DB9/26/2019Design-BuildForm2019
Bid Proposal Form CMARbd_bid_proposal_form_cmr.docxBid700.05CM9/26/2019Construction Manager at RiskForm2019
Bid Proposal Form DBBbd_bid_proposal_form_dbb.docxBid700.05DBB9/26/2019Design-Bid-Build-Minor, Design-Bid-Build-MajorForm2019
CDB - Exhibit B Fee Schedulecdb_svc_agmt_exh_b_fee_schedule.docxConstruction Phase, Bid, Prebid7/1/2019TOCA, TOCA-CDB, Collaborative-Design-BuildReference2019
Request for Proposals for Collaborative Design Buildcdb_rfp.docxBid, Prebid7/1/2019Collaborative-Design-BuildReference2019
CMAR-RFQ for CMAR with GMPcmr_model_ch_ii_rfq_for_cmr-wgmp.docxBid, Prebid6/6/2019Construction Manager at RiskReference2019
TOCA MEA Bid (Fee) Proposal Form PCTbd_bid_proposal_form_to-ca_mea-pct.docxBid700.05.TOCA-PCT4/1/2019TOCA, TOCA-CDB, TOCA-CMRForm2019
TOCA MEA Bid (Fee) Proposal Form HRbd_bid_proposal_form_to-ca_mea_hr.docxBid, Prebid700.05.TOCA-HR4/1/2019TOCA, TOCA-CDB, TOCA-CMRForm2019
Supplementary General Conditions for Construction Manager at Risk (CMAR) Major Projectssgcs_cmr_major.docxPrebid, Construction Phase, Bid3/1/2019Construction Manager at RiskGeneral Conditions2019
Supplementary General Conditions for Collaborative Design-Buildsgcs_cdb_major.docxConstruction Phase, Bid, Prebid3/1/2019Collaborative-Design-BuildGeneral Conditions2019
TOCA Calculation of Fees and GMP Exemplar (for TOCA Collaborative Design Build Only)toca_cdb_calculation-of-fees-and-gmp-exemplar.xlsxConstruction Phase, Prebid, Bid5/17/2018TOCA, TOCA-CDBForm2018
Abstract of Bids DBBbd_abstract_of_bids_dbb.xlsxBid701.01DBB3/1/2018Design-Bid-Build, Design-Bid-Build-Major, Design-Bid-Build-MinorForm2018
Abstract of Bids CMARbd_abstract_of_bids_cmr_fee_emr_hrs.xlsxBid701.01CM11/17/2017Construction Manager at RiskForm2017
Abstract of Bids DBbd_ abstract_of_bids_db.xlsxBid701.01DB11/1/2017Design-BuildForm2017
Technical Proposal Evaluation Scoresheet for Collaborative Design Buildcdb-model-tech-prop-eval-scoresheet.xlsxConstruction Phase, Bid, Prebid11/1/2017Collaborative-Design-BuildReference2017
Design-Builder Agreement for Design Phasedb_agreement_design_phase_cdb.docxConstruction Phase, Bid, Prebid11/1/2017Collaborative-Design-BuildReference2017
Bid Proposal Form Signature Pagebd_bid_proposal_form_signature_page.docxBid701.069/1/2017Collaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-Build, Job Order Contracts, TOCA-CDB, TOCA-CMRForm2017
Certificationbd_certification.docxBid702.039/1/2017TOCA, TOCA-CDB, Design-Bid-Build-Major, Construction Manager at Risk, Collaborative-Design-Build, Design-Bid-Build-Minor, Job Order Contracts, TOCA-CMRForm2017
Calculation of Fees and GMP Exemplar for Collaborative Design Buildcdb_calculation-of-fees-and-gmp-exemplar.xlsxBid, Prebid, Construction Phase7/1/2017Collaborative-Design-BuildForm2017
Abstract of Bids CDBbd_abstract_of_bids_cdb_fee_emr_hrs.xlsxBid701.01.CDB6/26/2017Collaborative-Design-BuildForm2017
Design-Build and Design-Assist Subcontractingmodel_db.da_subcontracting.pdfConstruction Phase, Bid, Prebid3/1/2017Collaborative-Design-Build, Construction Manager at RiskReference2017
Bid Overrun Analysis Policy No. 2bd_bid_overrun_analysis_policy_no.2.pdfBid5/12/2016Form2016
Certificate of Appropriate Licensebd_cert_of_appr-license_dir-pub-wks-reg_ca-co.docxBid701.083/9/2016Collaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-Build, Job Order Contracts, TOCA, TOCA-CDB, TOCA-CMRForm2016
List of Proposed Subcontractorsbd_list_of_proposed_subcontractors.docxBid701.041/20/2015Design-Bid-Build-Major, Design-Bid-Build-MinorForm2015
List of Subcontractors—Additional Informationbd_list_of_subcontractors_additional_information.docxBid701.04A1/20/2015Design-Bid-Build-Major, Design-Bid-Build-Minor, Job Order ContractsForm2015
List of Subcontractors for Design-Build Projectsbd_list_of_subcontractors_db_projects.docxBid701.04A.DB1/20/2015Design-BuildForm2015
List of Subcontractors for CMARbd_list_of_subcontractors_cmr_projects.docxBid701.04A.CM1/20/2015Construction Manager at Risk, TOCA, TOCA-CMRForm2015
Bid Proposal Form NonStandard (Modify for Design-Build and CMAR)bd_bid_proposal_form_nonstd.docxBid700.05N1/16/2015Design-Bid-Build-Major, Design-Bid-Build-Minor, Construction Manager at RiskForm2015
Notice Inviting Bids BD_Notice_Inviting_Bids.docxBid700.061/15/2015Form2015
Prevailing Wage Rates Cover Pagebd_prevailing_wage_rates_cover.docxBid6/12/2014Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-Build, Construction Manager at Risk, Job Order Contracts, TOCA-CMRReference2014
Prime Contractor’s DVBE Subcontracting Report-Instructions for both the Prime Contractor and the CampusPrime-DVBE-Sub-Report-Instructions.docxBid810P Instr.6/1/2014TOCA, TOCA-CDB, TOCA-CMR, Collaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-Build, Job Order ContractsInstructions2014
Conflict of Interest and Confidentiality Statementbd_conflict_of_interest_and_confidentiality_stmt.docxAgreements, BidCRL0571/30/2014TOCA-CDB, Design-Build, Collaborative-Design-Build, Construction Manager at Risk, TOCA-CMRForm2014
CEQA Mitigation and Monitoring Programcmr_model_app_13_ceqa_mitigation_and_monitoring_program.docBid, Construction Phase, Prebid6/24/2013Construction Manager at RiskReference2013
Technical Proposal Summary CMARbd_abstract_of_bids_cmr_summary_emr_hrs_fee.xlsxBid701.01T.CM11/1/2012Construction Manager at RiskForm2012
Noncollusion Declarationbd_noncollusion_declaration.docBid701.051/4/2012Collaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-Build, Job Order Contracts, TOCA, TOCA-CDBForm2012
DVBE-Tbd_dvbe_part_req_transmittal.docBidDVBE-T12/14/2010Collaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-Build, Job Order Contracts, TOCA-CDB, TOCA-CMRForm2010
DVBE-1bd_dvbe_att1_summary_of_dv-owned_bus_part.docBidDVBE-18/10/2009Collaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-Build, Job Order Contracts, TOCA-CDB, TOCA-CMRForm2009
DVBE-2bd_dvbe_att2_bidders_certification.docBidDVBE-28/10/2009Collaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-Build, Job Order Contracts, TOCA, TOCA-CDB, TOCA-CMRForm2009
Chapter I - Article B - Instructions to CampusChI-Article_B.docBid4/1/2008Design-BuildForm2008
Chapter I - Article C - Uniform Table of ContentsChI-Article_C.docBid4/1/2008Design-BuildForm2008
Statement of Finances Prior to BidsBD_Statement_of_Finances_Prior_to_Bid.xlsBid12/13/2007Form2007
Bidders Bondbd_bidders_bond.docBid702.09A4/4/2007Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-BuildForm2007
Bidders Bond JOC bd_bidders_bond_joc.docBidJ702.09A4/4/2007Job Order ContractsForm2007
Technical Proposal Summary DBbd_technical_proposal_summary_db.xlsBid701.01T.DB3/22/2007Design-Build
List of Proposed Subcontractors CMRBD_List_of_Proposed_Subcontractors_CMR.docBid701.04CM10/1/2006Construction Manager at RiskForm2006
DVBE Declarations Formbd-dvbe_formstd843.pdfBidSTD 8435/1/2006Collaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Bid-Build-Minor, Design-Build, TOCA, TOCA-CDB, Job Order ContractsForm2006
California State University Insurance Program OverviewOCIP-CPL-OPPI-Insurance-Summary.pdfAward, Bid, Construction PhaseCollaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-BuildAllInsurance
Summary of Coverage for 2017-18BRIPSummaryofCoverage2017-18.pdfBid, Award, Construction PhaseCollaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Build, TOCAAllInsurance
Summary of Coverage for 2018-20 amendedBRIPSummaryofCoverage2018-20_amnd.pdfBid, Award, Construction PhaseCollaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Build, TOCAAllInsurance
Information Regarding Delay in Construction/Loss of Rent Insurance Coverage, December 2008Delay_in_Constr_Coverage.docAward, Bid, Construction PhaseCollaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Build, TOCAAllInsurance
Construction Classifications & Rates2018-19_and_2019-20_BRIP_Rates-Classifications.pdfBid, Award, Construction PhaseCollaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Build, TOCAAllInsurance
Summary of Coverage for 2016-17BRIPSummaryofCoverage2016-17.pdfBid, Award, Construction PhaseCollaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Build, TOCAAllInsurance
Information and Procedures, November 2018brip_procedure_nov18.pdfAward, Bid, Construction PhaseCollaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-BuildAllInsurance
Builders Risk Applicationbrip_builders_risk_application_csu.pdfAward, Bid, Construction PhaseCollaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-Build, Design-Bid-BuildAllInsurance
Information and Procedures, July 2020brip_procedure_july20.pdfAward, Bid, Construction PhaseCollaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-BuildAllInsurance
Information and Procedures, January  2021brip_procedure_jan21.pdfAward, Bid, Construction PhaseCollaborative-Design-Build, Construction Manager at Risk, Design-Bid-Build-Major, Design-BuildAllInsurance