1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 516 PROJECT TITLE: SEISMIC UPGRDE COLUSA HALL

CAMPUS: CHICO DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0658 HIGHER EDUCATION CAPITAL OUTLAY-96 96 0162 6610 300 651,369.50

------------

TOTAL EXPENDITURES 651,369.50

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

 

 

1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 627 PROJECT TITLE: REPLACEMENT HQT BLDG

CAMPUS: CHANCELLORS OFFICE DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0576 DORMITORY CONSTRUCTION FUND 47 1153 6610 800 32,942,095.87

------------

TOTAL EXPENDITURES 32,942,095.87

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

 

 

1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 365 PROJECT TITLE: SEISMIC SAFETY(4)LIBRARY BLDG

CAMPUS: FULLERTON DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0660 PUBLIC BUILDING CONSTRUCTION FUND 95 0303 6610 300 5,585,550.27

0705 HIGHER EDUCATION CAPITAL OUTLAY-92 93 0055 6610 300 528,114.18

------------

TOTAL EXPENDITURES 6,113,664.45

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

 

 

1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 245 PROJECT TITLE: JO GIAN COM ARCH & SEIS REN 1

CAMPUS: HUMBOLDT DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0576 DORMITORY CONSTRUCTION FUND 47 1153 6610 800 6,702,489.04

0705 HIGHER EDUCATION CAPITAL OUTLAY-92 95 0303 6610 300 229,999.35

------------

TOTAL EXPENDITURES 6,932,488.39

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

 

 

1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 368 PROJECT TITLE: SEISMIC SAFETY(5.3)E GYM

CAMPUS: HUMBOLDT DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0660 PUBLIC BUILDING CONSTRUCTION FUND 95 0303 6610 300 597,212.49

------------

TOTAL EXPENDITURES 597,212.49

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

 

 

1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 301 PROJECT TITLE: STUDENT UNION IMPROVEMENT

CAMPUS: LOS ANGELES DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0576 DORMITORY CONSTRUCTION FUND 47 1153 6610 800 6,840,769.05

------------

TOTAL EXPENDITURES 6,840,769.05

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

 

 

1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 369 PROJECT TITLE: SEISMIC SAFETY(5.4)SIMPSON TW

CAMPUS: LOS ANGELES DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0660 PUBLIC BUILDING CONSTRUCTION FUND 95 0303 6610 300 3,829,707.44

------------

TOTAL EXPENDITURES 3,829,707.44

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

1CWIP14

 

 

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 442 PROJECT TITLE: THERMAL ENERGY STORAGE/ELEC

CAMPUS: LOS ANGELES DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0576 DORMITORY CONSTRUCTION FUND 47 1153 6610 800 2,477,275.15

0660 PUBLIC BUILDING CONSTRUCTION FUND 95 0303 6610 300 6,292,999.98

0705 HIGHER EDUCATION CAPITAL OUTLAY-92 92 0587 6610 300 694,725.05

0705 HIGHER EDUCATION CAPITAL OUTLAY-92 93 0055 6610 300 5,186,515.15

------------

TOTAL EXPENDITURES 14,651,515.33

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

 

 

1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 533 PROJECT TITLE: SEISMIC UPGRADE-LIBRARY SOUTH

CAMPUS: LOS ANGELES DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0658 HIGHER EDUCATION CAPITAL OUTLAY-96 96 0162 6610 300 160,778.12

0658 HIGHER EDUCATION CAPITAL OUTLAY-96 97 0282 6610 300 1,123,468.45

------------

TOTAL EXPENDITURES 1,284,246.57

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

 

 

1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 559 PROJECT TITLE: WD SEISMIC SAFERY ADMIN

CAMPUS: LOS ANGELES DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0576 DORMITORY CONSTRUCTION FUND 47 1153 6610 800 129,153.63

0660 PUBLIC BUILDING CONSTRUCTION FUND 95 0303 6610 300 3,704,080.30

0705 HIGHER EDUCATION CAPITAL OUTLAY-92 93 0055 6610 300 148,800.00

------------

TOTAL EXPENDITURES 3,982,033.93

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

 

 

1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 610 PROJECT TITLE: CAMPUS UNION EXPANSION

CAMPUS: LONG BEACH DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0576 DORMITORY CONSTRUCTION FUND 47 1153 6610 800 2,279,454.55

0576 DORMITORY CONSTRUCTION FUND 47 1153 6610 800 10,929,622.66

------------

TOTAL EXPENDITURES 13,209,077.21

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

 

 

1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 764 PROJECT TITLE: UTIL INFRASTRUCTURE UPGRADE

CAMPUS: MARITIME ACADEMY DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0576 DORMITORY CONSTRUCTION FUND 47 1153 6610 800 239,572.88

0658 HIGHER EDUCATION CAPITAL OUTLAY-96 97 0282 6610 300 2,759,834.39

------------

TOTAL EXPENDITURES 2,999,407.27

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

 

 

1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 496 PROJECT TITLE: CNTRL PLNT & UTL INFRAST I&II

CAMPUS: NORTHRIDGE DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0576 DORMITORY CONSTRUCTION FUND 47 1153 6610 800 1,348,093.67

0660 PUBLIC BUILDING CONSTRUCTION FUND 95 0303 6610 300 24,214,196.09

0705 HIGHER EDUCATION CAPITAL OUTLAY-92 93 0055 6610 300 1,423,767.00

------------

TOTAL EXPENDITURES 26,986,056.76

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

 

 

1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 979 PROJECT TITLE: BUS ADMIN/ECON/EDUC BLDG

CAMPUS: NORTHRIDGE DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0658 HIGHER EDUCATION CAPITAL OUTLAY-96 98 0324 6610 300 700,000.00

------------

TOTAL EXPENDITURES 700,000.00

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

 

 

1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 564 PROJECT TITLE: WD SEISMIC SAFETY, PHAU LIB

CAMPUS: SAN BERNARDINO DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0576 DORMITORY CONSTRUCTION FUND 47 1153 6610 800 2,980.00

0658 HIGHER EDUCATION CAPITAL OUTLAY-96 97 0282 6610 300 11,500.00

0660 PUBLIC BUILDING CONSTRUCTION FUND 95 0303 6610 300 5,741,999.68

0705 HIGHER EDUCATION CAPITAL OUTLAY-92 93 0055 6610 300 130,000.00

------------

TOTAL EXPENDITURES 5,886,479.68

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

 

 

1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 965 PROJECT TITLE: STUDENT ACTIVITY CENTER

CAMPUS: SAN DIEGO DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0576 DORMITORY CONSTRUCTION FUND 47 1153 6610 800 38,746,588.19

------------

TOTAL EXPENDITURES 38,746,588.19

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

 

 

1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 454 PROJECT TITLE: ADMIN BLDG SEISMIC REHAB

CAMPUS: SAN FRANCISCO DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0660 PUBLIC BUILDING CONSTRUCTION FUND 95 0303 6610 300 10,326,771.72

0705 HIGHER EDUCATION CAPITAL OUTLAY-92 92 0587 6610 300 519,000.00

------------

TOTAL EXPENDITURES 10,845,771.72

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

 

 

1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 476 PROJECT TITLE: CENT PLNT & UTIL INFRESTUCTUR

CAMPUS: SAN FRANCISCO DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0576 DORMITORY CONSTRUCTION FUND 47 1153 6610 800 442,808.00

0660 PUBLIC BUILDING CONSTRUCTION FUND 95 0303 6610 300 20,069,256.91

0705 HIGHER EDUCATION CAPITAL OUTLAY-92 93 0055 6610 300 966,802.44

------------

TOTAL EXPENDITURES 21,478,867.35

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

 

 

1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 475 PROJECT TITLE: UPGD UTILT,HEAT,&WATER DISTRI

CAMPUS: SAN LUIS OBISPO DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0576 DORMITORY CONSTRUCTION FUND 47 1153 6610 800 523,911.17

0660 PUBLIC BUILDING CONSTRUCTION FUND 95 0303 6610 300 20,421,242.56

0705 HIGHER EDUCATION CAPITAL OUTLAY-92 93 0055 6610 300 1,184,400.00

------------

TOTAL EXPENDITURES 22,129,553.73

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

 

 

1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 460 PROJECT TITLE: ACADEMIC COMPLEX II

CAMPUS: SAN MARCOS DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0658 HIGHER EDUCATION CAPITAL OUTLAY-96 96 0162 6610 300 13,833,361.21

0705 HIGHER EDUCATION CAPITAL OUTLAY-92 92 0587 6610 300 1,623,631.24

------------

TOTAL EXPENDITURES 15,456,992.45

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

 

 

1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 986 PROJECT TITLE: INITIAL FACILITY

CAMPUS: SAN MARCOS DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0658 HIGHER EDUCATION CAPITAL OUTLAY-96 98 0324 6610 300 570,000.00

------------

TOTAL EXPENDITURES 570,000.00

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

 

 

1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 532 PROJECT TITLE: SEISMIC UPGRADE-DARWIN&STEVEN

CAMPUS: SONOMA DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0658 HIGHER EDUCATION CAPITAL OUTLAY-96 96 0162 6610 300 510,549.46

------------

TOTAL EXPENDITURES 510,549.46

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

WILLIAM P. MUSSELMAN

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

 

 

 

 

 

1CWIP14

 

 

 

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY AND COLLEGES

CSU ACCOUNTING OFFICE

STATEMENT OF EXPENDITURES FOR CAPITALIZATION

PROJECT NO.: 462 PROJECT TITLE: PROFESSIONAL SCHOOLS BUILDING

CAMPUS: STANISLAUS DATE: 6/17/99

 

FUND DESCRIPTION APPROPRIATION AMOUNT

---------------- ---------------- ------------

0658 HIGHER EDUCATION CAPITAL OUTLAY-96 96 0162 6610 300 14,001,468.89

0705 HIGHER EDUCATION CAPITAL OUTLAY-92 92 0587 6610 300 620,843.23

------------

TOTAL EXPENDITURES 14,622,312.12

============

 

 

 

 

 

 

I CERTIFY THESE FUNDS WERE EXPENDED FOR THIS PROJECT.

THE AMOUNTS REPORTED SHOULD BE CAPITALIZED BY THE CAMPUS.

 

 

ACCOUNTING DIRECTOR

CSU ACCOUNTING OFFICE

251,966,758.96