Capital Planning Design and Construction
 

Construction Management

Division One

Table of Contents
Section Rev.
01 11 00 Summary of Work 3/2017
01 14 00 Work Restrictions 3/2017
01 21 00 Allowances 3/2017
01 22 00 Unit Prices 3/2017
01 23 00 Alternates 3/2017
01 25 00 Substitution Procedures 3/2017
01 26 13 Requests for Interpretation 3/2017
01 31 13 Coordination 3/2017
01 31 19 Project Meetings 3/2017
01 31 26 Electronic Communications Protocol 3/2017
01 32 00 Construction Progress Documentation 3/2017
01 33 00 Submittal Procedures 3/2017
01 33 00A Submittal Routing Form 3/2017
01 35 00 Special Procedures 3/2017
01 35 23 Owner Safety Requirements 3/2017
01 35 43 Environmental Procedures Hazardous Materials 3/2017
01 35 53 Security 3/2017
01 41 00 Regulatory Requirements 3/2017
01 42 00 Reference Standards and Abbreviations 3/2017
01 43 39 Mock-Ups 3/2017
01 45 00 Quality Control 3/2017
01 45 29 Testing Lab Services 3/2017
01 51 00 Temporary Utilities 3/2017
01 52 00 Construction Facilities 3/2017
01 55 00 Vehicle and Pedestrian Controls 3/2017
01 55 29 Construction Staging Areas 3/2017
01 56 39 Temporary Tree and Plant Protection 3/2017
01 57 00 Temporary Controls 3/2017
01 57 10 Existing Finish Protection 3/2017
01 57 23 Storm Water Pollution Prevention 3/2017
01 57 23A SWPPP Monthly Report 3/2017
01 60 00 Product Requirements 3/2017
01 71 00 Examination and Preparation Requirements 3/2017
01 73 00 Execution Requirements 3/2017
01 73 29 Cutting and Patching Requirements 3/2017
01 74 00 Cleaning Requirements 3/2017
01 74 19 Construction Waste Management 3/2017
01 74 19A Construction Waste & Recycling Plan 3/2017
01 74 19B Contractors Reuse, Recycling, & Disposal Report 3/2017
01 75 00 Starting and Adjusting Procedures 3/2017
01 77 00 Closeout Procedures 3/2017
01 78 10 Survey and Layout Data 3/2017
01 78 23 Operation and Maintenance Data 3/2017
01 78 36 Warranties 3/2017
01 78 39 Project Record Documents 3/2017
02 41 00 Demolition 3/2017
02 41 00A Contractors Building Demolition Waste & Recycling Plan 3/2017
02 41 00B Contractors Building Demolition Waste & Recycling, & Report 3/2017

“Depending on the size of your project, all sections may not apply. Campus staff shall choose appropriate sections as applicable.”