Mechanical Peer Review Resume: Kent W. Peterson, P.E.
Experience
Mr. Peterson, a principal of P2S Engineering, has been involved in all
aspects of consulting engineering services, including executive management,
mechanical, control systems, plumbing, construction management, code compliance
and standards. He has over twenty years of experience working in consulting
engineering. His design experience has includes innovative projects involving
energy-efficient mechanical and control system designs for large facilities.
The mechanical designs have ranged from cleanroom/ laboratory facilities
to large campus central heating and cooling plants. His experience encompasses
all project phases from feasibility studies through system testing and
commissioning.
Mr. Peterson is currently Vice President for the American Society of Heating,
Refrigeration and Air Conditioning Engineers. He chairs the ASHRAE Technology
Council overseeing all the technical activities, research and standards
for ASHRAE. He has served on the ASHRAE Board of Directors for the past
five years.
Representative Projects
UCSD West Campus Satellite Plant Phase 1 – Mechanical Engineer-of-Record
The plant includes 2,000 tons of cooling with a future build out to 8,000
tons. The plant provides 3.0 MW of emergency power with a future capacity
of 6.0 MW. The chilled water plant is designed as a primary variable flow
configuration.
HP PHM Expansion Phase 2 – Project Manager/Engineer-of-Record
This $35M project converted 55,000 SF of existing building space to ISO
Class 7 cleanrooms. Design included HVAC systems, high purity piping,
central plant upgrades, process vacuum, chemical distribution, high purity
water systems and specialized exhaust systems.
CSU Long Beach Central Plant – Project Manager/Engineer of Record
Designed a new central heating and cooling plant to serve a university
campus with over 2 million SF of air-conditioned space and 3 million SF
of heated space. The plant included 5,000 tons of cooling capacity and
34,000 ton-hours of thermal storage. The project also included over 10
miles of underground piping.
Professional Registrations
California Mechanical M26243
Recent Classes, Seminars and Speaking Engagements
Achieving Design Quality – ASHRAE Winter Meeting 2004
Cleanroom HVAC System Design – ASHRAE Southern California Chapter
2004
Designing the Future – GSA HVAC Design for Excellence Seminar
2003
Controls for IAQ – ASHRAE/CIBSE Conference 2002
Designing Central Chilled Water Plants – ASHRAE Tri-County Chapter
2002
Recent Publications
Primary-Chilled Water Flow Chilled Water Plant Conversion - HPAC March
2004
Pharmaceutical Cleanroom HVAC Design - ACREX 2004
Indoor Air Quality & ASHRAE Standard 62 - ACREX 2004
P2S Engineering website: www.p2seng.com
|